Question 2785
Match List 1 with List 2 and choose the correct answer form the code given below: List 1 (Hydro Electric Power Plant) List 2 (States) (a) Kopali 1. Maharashtra (b) Dool-Hasti 2. Assam (c) Koyna 3. Jammu and Kashmir (d) Ranganadi 4. Arunachal Pradesh
Answer
(a) - 2, (b) - 3, (c) - 1, (d) - 4
Why?
(Hydro Electric Power Plant) (States) Kopali Located on the River Kopili in the Dima Hasao District of Assam , the Kopili Hydro Electric Project was the maiden venture of NEEPCO when it came into existence in 1976. Dool-Hasti Dul Hasti is a 390 MW hydroelectric power plant in Kishtwar district of Jammu and Kashmir , India built by NHPC. The power plant is a run-of-the-river type on the Chenab River. Koyna The Koyna Hydroelectric Project is the second largest hydroelectric power plant in India, just after Tehri Dam Project. It is a complex project with four dams including the largest dam on the Koyna River, Maharashtra. The project site is in Satara district. Ranganadi This Project is located in the Lower Subansiri District of the State of Arunachal Pradesh in the Ranganadi basin and the adjoining Dikrong basin.